{"id":1177,"date":"2026-09-30T01:00:00","date_gmt":"2026-09-30T01:00:00","guid":{"rendered":"https:\/\/mixingplantpro.com\/?p=1177"},"modified":"2026-09-15T06:15:31","modified_gmt":"2026-09-15T06:15:31","slug":"concrete-batching-plant-layout-zones-guide","status":"publish","type":"post","link":"https:\/\/mixingplantpro.com\/de\/concrete-batching-plant-layout-zones-guide\/","title":{"rendered":"Beton-Matching-Anlagenlayout: Zonen, die Sie zuerst planen sollten"},"content":{"rendered":"<p>Concrete batching plant layout has a direct effect on production rhythm, material handling, truck movement, maintenance access and environmental control. A plant can have suitable mixer capacity and reliable weighing equipment yet still perform poorly if aggregate loaders cross truck queues, cement tankers block dispatch lanes, or maintenance areas are squeezed between operating equipment.<\/p>\n<p>For buyers, the layout should therefore be developed before the final equipment arrangement is approved. The goal is not simply to fit the plant inside the property boundary. It is to create a site where raw materials can enter, concrete can leave, maintenance can be performed and future changes can be made without unnecessary conflict.<\/p>\n<p>Unser <a href=\"https:\/\/mixingplantpro.com\/de\/produkt\/seitlich-montierte-bandbetonmischanlage\/\">Seitlich angebrachte Bandbetonmischanlage<\/a> und <a href=\"https:\/\/mixingplantpro.com\/de\/produkt\/uberkopfbandbetonmischanlage\/\">\u00dcberkopfbandbetonmischanlage<\/a> use different silo arrangements while sharing belt-fed aggregate handling. This guide explains how to plan a concrete batching plant layout around the functional zones that matter most.<\/p>\n<h2>What Should a Concrete Batching Plant Layout Include?<\/h2>\n<figure class=\"wp-block-image aligncenter size-full\" style=\"text-align:center;margin:28px auto;\"><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/mixingplantpro.com\/wp-content\/uploads\/2026\/08\/Side-mounted-belt-concrete-mixing-plant02.jpg\" alt=\"Seitlich angebrachte Bandbetonmischanlage mit Pulversilos\" width=\"800\" height=\"600\" style=\"display:block;margin-left:auto;margin-right:auto;max-width:100%;height:auto;\" \/><\/figure>\n<p>A concrete batching plant layout should show more than the mixer, aggregate bins and cement silos. A useful plan divides the site into functional zones and shows how people, trucks and materials move between them.<\/p>\n<p>At minimum, include:<\/p>\n<ul>\n<li>aggregate receiving and storage;<\/li>\n<li>aggregate loader or conveyor routes;<\/li>\n<li>cementitious-material delivery and silos;<\/li>\n<li>water and admixture storage;<\/li>\n<li>batching, mixing and discharge;<\/li>\n<li>mixer-truck entry, queue, loading and exit;<\/li>\n<li>washout or process-water handling;<\/li>\n<li>maintenance and spare-parts access;<\/li>\n<li>control room and operator visibility;<\/li>\n<li>future expansion space.<\/li>\n<\/ul>\n<p>A concrete batching plant layout becomes useful when each zone has a defined purpose and its traffic does not interfere unnecessarily with another zone.<\/p>\n<h2>Plan Aggregate Receiving Before You Position the Main Plant<\/h2>\n<p>Aggregate usually represents the largest material flow on the site. That makes aggregate receiving one of the first zones to plan.<\/p>\n<p>Decide how material arrives, where trucks unload, how stockpiles or bins are separated and how the loader reaches the batching bins.<\/p>\n<p>For a concrete batching plant layout, check:<\/p>\n<table>\n<thead>\n<tr>\n<th>Aggregate question<\/th>\n<th>Warum es wichtig ist<\/th>\n<th>Layout implication<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>How many aggregate fractions are used?<\/td>\n<td>Different fractions need separation.<\/td>\n<td>Number and size of stockpile bays or bins.<\/td>\n<\/tr>\n<tr>\n<td>How does aggregate arrive?<\/td>\n<td>Truck size and unloading method affect access.<\/td>\n<td>Receiving lane and turning space.<\/td>\n<\/tr>\n<tr>\n<td>How does aggregate reach the batcher?<\/td>\n<td>Loader, belt or other transfer method changes traffic.<\/td>\n<td>Dedicated loader route or conveyor alignment.<\/td>\n<\/tr>\n<tr>\n<td>How is moisture controlled?<\/td>\n<td>Rain and drainage can affect batching corrections.<\/td>\n<td>Covered storage, drainage and stockpile orientation.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Do not place the mixer first and then force the aggregate route around it. In many plants, aggregate movement determines more of the daily site traffic than the mixer itself.<\/p>\n<h2>Separate Loader Routes from Mixer-Truck Routes<\/h2>\n<p>One of the most important concrete batching plant layout decisions is separating aggregate-loader traffic from finished-concrete truck traffic.<\/p>\n<p>A wheel loader repeatedly moves between stockpiles and aggregate bins. Mixer trucks enter, queue, load and leave. When these routes cross constantly, each vehicle becomes a moving obstacle to the other.<\/p>\n<p>Plan the loader route as a short production loop. Avoid forcing the loader to cross the truck queue every cycle.<\/p>\n<p>Also consider visibility. Large stockpiles, silos and plant structures can create blind corners.<\/p>\n<p>Where route crossings cannot be avoided, the project team should review signage, traffic controls and operational procedures. The preferred concrete batching plant layout reduces the number of crossings before relying on procedures to manage them.<\/p>\n<h2>Truck Queue Space Can Limit Plant Output<\/h2>\n<p>A plant can mix concrete faster than trucks can move through the loading position.<\/p>\n<p>For concrete batching plant layout planning, determine how many mixer trucks may arrive during the peak production window and where they will wait.<\/p>\n<p>Consider a hypothetical example. If one truck enters the loading position every five minutes and the project needs eight trucks queued during a peak pour, the site must provide enough safe waiting space for those trucks without blocking aggregate deliveries, cement tankers or the plant exit.<\/p>\n<p>A queue that extends onto the public road or across the loader route creates an operational problem even if the mixer itself is meeting its rated cycle.<\/p>\n<p>Draw the complete truck path:<\/p>\n<ul>\n<li>site entrance;<\/li>\n<li>identification or dispatch point;<\/li>\n<li>queue lane;<\/li>\n<li>mixer loading position;<\/li>\n<li>wash or rinse point where applicable;<\/li>\n<li>exit.<\/li>\n<\/ul>\n<p>The best concrete batching plant layout treats truck movement as part of the production cycle.<\/p>\n<h2>Keep Cement Tanker Access Independent from Dispatch<\/h2>\n<p>Cement and supplementary powder deliveries can temporarily occupy a large area near silos. Tankers may need to position hoses, connect pneumatic lines and remain in place while unloading.<\/p>\n<p>If the cement tanker blocks concrete trucks, every powder delivery can interrupt production.<\/p>\n<p>For a concrete batching plant layout, place silo filling points where delivery vehicles can enter and exit without occupying the primary mixer-truck route.<\/p>\n<p>Also review:<\/p>\n<ul>\n<li>tanker turning radius;<\/li>\n<li>hose connection position;<\/li>\n<li>operator access;<\/li>\n<li>clearance around silo legs or support structures;<\/li>\n<li>dust-control equipment;<\/li>\n<li>overhead obstructions.<\/li>\n<\/ul>\n<p>On our side-mounted belt plant, powder silos are arranged beside the main mixing structure. On the overhead belt plant, powder silos are positioned above the main building. These arrangements change the delivery and maintenance geometry even when the aggregate system is similar.<\/p>\n<h2>Choose Side-Mounted or Overhead Silos from the Whole Site Plan<\/h2>\n<figure class=\"wp-block-image aligncenter size-full\" style=\"text-align:center;margin:28px auto;\"><img decoding=\"async\" src=\"https:\/\/mixingplantpro.com\/wp-content\/uploads\/2026\/08\/Concrete-Mixing-Tower01.jpg\" alt=\"Betonmischturm mit Zuschlagstofff\u00f6rderer und Lagersilos\" width=\"800\" height=\"600\" style=\"display:block;margin-left:auto;margin-right:auto;max-width:100%;height:auto;\" \/><\/figure>\n<p>Silo location changes the concrete batching plant layout significantly.<\/p>\n<p>A side-mounted silo arrangement uses more horizontal space but can simplify access around individual silos and keep the main structure lower.<\/p>\n<p>An overhead arrangement concentrates storage vertically and can reduce the horizontal footprint of the central production area. It also changes total structure height, access requirements and support loads.<\/p>\n<p>Do not decide only from \u201ccompact\u201d versus \u201cspacious.\u201d Compare:<\/p>\n<table>\n<thead>\n<tr>\n<th>Layout factor<\/th>\n<th>Side-mounted silos<\/th>\n<th>Overhead silos<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Horizontal footprint<\/td>\n<td>Requires more space beside main building<\/td>\n<td>Concentrates storage vertically<\/td>\n<\/tr>\n<tr>\n<td>Overall height<\/td>\n<td>Generally lower central arrangement<\/td>\n<td>Higher structure needs vertical clearance review<\/td>\n<\/tr>\n<tr>\n<td>Wartungszugang<\/td>\n<td>Service areas distributed beside plant<\/td>\n<td>More elevated access may be required<\/td>\n<\/tr>\n<tr>\n<td>Powder transfer route<\/td>\n<td>Longer horizontal or inclined transfer may be needed<\/td>\n<td>Gravity can assist some downward movement<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The correct concrete batching plant layout depends on the property shape, height restrictions, wind, maintenance strategy and long-term expansion plan.<\/p>\n<h2>Plan Conveyor Routes as Permanent Site Infrastructure<\/h2>\n<p>Belt conveyors are not just links between aggregate bins and the mixer. They occupy space, need supports and require maintenance access.<\/p>\n<p>Our belt-fed plants use flat and inclined conveyors to move aggregate toward the elevated receiving point.<\/p>\n<p>When planning a concrete batching plant layout, draw:<\/p>\n<ul>\n<li>the full belt centerline;<\/li>\n<li>support locations;<\/li>\n<li>transfer points;<\/li>\n<li>inspection walkways;<\/li>\n<li>drive and pulley access;<\/li>\n<li>areas beneath the conveyor;<\/li>\n<li>crossings over roads or walkways.<\/li>\n<\/ul>\n<p>A conveyor that passes across a truck road can create height-clearance and protection requirements. A conveyor too close to a property boundary can make roller or belt replacement difficult.<\/p>\n<p>Leave enough space to maintain the conveyor rather than designing only for normal operation.<\/p>\n<h2>Put the Mixer Loading Point Where Trucks Can Enter and Leave Smoothly<\/h2>\n<p>The mixer discharge position is the main interface between plant production and concrete delivery.<\/p>\n<p>A good concrete batching plant layout allows a truck to approach, stop in the correct loading position and leave without complex reversing or blocking the next truck.<\/p>\n<p>Pr\u00fcfen:<\/p>\n<ul>\n<li>truck approach angle;<\/li>\n<li>clearance under the loading structure;<\/li>\n<li>queuing behind the active truck;<\/li>\n<li>driver visibility;<\/li>\n<li>room for maintenance under the discharge area;<\/li>\n<li>drainage and cleanup around the loading point.<\/li>\n<\/ul>\n<p>If multiple truck sizes are expected, use the largest realistic vehicle in the turning and clearance review.<\/p>\n<p>The discharge area should also remain accessible for service when the plant is isolated.<\/p>\n<h2>Give the Control Room a Useful View of Operations<\/h2>\n<p>The control room should support safe and efficient operation.<\/p>\n<p>In a concrete batching plant layout, place the control station where operators can monitor key production areas directly or through reliable camera coverage.<\/p>\n<p>Useful visibility may include:<\/p>\n<ul>\n<li>Sammelbeh\u00e4lter;<\/li>\n<li>truck loading point;<\/li>\n<li>main conveyor transfers;<\/li>\n<li>cement tanker zone;<\/li>\n<li>queue area;<\/li>\n<li>maintenance access gates.<\/li>\n<\/ul>\n<p>The control room should not be placed only where electrical cable runs are shortest. Operator visibility, noise exposure, dust and emergency access also matter.<\/p>\n<p>Unser <a href=\"https:\/\/mixingplantpro.com\/de\/ruckverfolgbarkeit-intelligenter-betonmischanlagen\/\">Smart Beton-Chargenanlage-Leitfaden<\/a> explains how cameras, batch records and alarms can support production control, but physical layout remains important even with digital monitoring.<\/p>\n<h2>Reserve a Maintenance Zone Around the Main Equipment<\/h2>\n<p>Maintenance access is often the first thing lost when a site is made too compact.<\/p>\n<p>Concrete batching plant layout should show where technicians will stand, lift, remove and replace major components.<\/p>\n<p>For the mixer, identify access for:<\/p>\n<ul>\n<li>mixing tools and liners;<\/li>\n<li>drive components;<\/li>\n<li>lubrication systems;<\/li>\n<li>discharge gates;<\/li>\n<li>inspection doors.<\/li>\n<\/ul>\n<p>For weighing systems, leave room around hoppers, load cells and flexible connections. For conveyors, reserve access to drives, pulleys and belt take-up areas.<\/p>\n<p>Unser <a href=\"https:\/\/mixingplantpro.com\/de\/concrete-mixer-maintenance-inspection-guide\/\">Wartungsleitfaden f\u00fcr Betonmischer<\/a> shows why maintenance space should be considered during plant design rather than after installation.<\/p>\n<h2>Plan Dust-Control Zones Around Material Transfers<\/h2>\n<figure class=\"wp-block-image aligncenter size-full\" style=\"text-align:center;margin:28px auto;\"><img decoding=\"async\" src=\"https:\/\/mixingplantpro.com\/wp-content\/uploads\/2026\/08\/Side-mounted-bucket-concrete-mixing-plant01.jpg\" alt=\"Geschlossene seitlich angebrachte Eimerbetonmischanlage\" width=\"800\" height=\"600\" style=\"display:block;margin-left:auto;margin-right:auto;max-width:100%;height:auto;\" \/><\/figure>\n<p>Concrete batching plant layout affects environmental control because dust sources are created where materials are unloaded, transferred and stored.<\/p>\n<p>Locate powder filling and weighing points so extraction equipment can be installed and serviced. Enclose aggregate transfer points where appropriate. Avoid placing dusty material-handling operations directly beside offices or sensitive boundaries when another arrangement is possible.<\/p>\n<p>The EPA identifies cement handling, aggregate transfer, stockpiles and vehicle movement as particulate-emission sources in concrete batching operations. See the <a href=\"https:\/\/www.epa.gov\/air-emissions-factors-and-quantification\/ap-42-fifth-edition-volume-i-chapter-11-mineral-products-0\" target=\"_blank\" rel=\"noopener\">EPA AP-42 mineral products guidance<\/a>.<\/p>\n<p>Unser <a href=\"https:\/\/mixingplantpro.com\/de\/leitfaden-zum-umweltdesign-von-chargenanlagen\/\">Leitfaden zum Umweltdesign von Chargenanlagen<\/a> explains these controls in more detail.<\/p>\n<h2>Separate Washout and Process-Water Areas from Clean Traffic<\/h2>\n<p>Truck washing, chute rinsing and plant cleanup can generate water containing cementitious solids.<\/p>\n<p>Concrete batching plant layout should direct these activities toward a controlled collection area rather than allowing process water to spread across the yard.<\/p>\n<p>Plan:<\/p>\n<ul>\n<li>truck washout location;<\/li>\n<li>surface drainage;<\/li>\n<li>settling or solids separation;<\/li>\n<li>access for cleaning collected material;<\/li>\n<li>separation from clean stormwater where practical.<\/li>\n<\/ul>\n<p>Do not place the washout zone where trucks must cross clean aggregate stockpile access or the main plant entrance unnecessarily.<\/p>\n<p>A water-management area that is difficult to reach or clean will quickly become a housekeeping problem.<\/p>\n<h2>Include Utilities in the Concrete Batching Plant Layout<\/h2>\n<p>Power, water, compressed air and communications all need routes through the site.<\/p>\n<p>For a concrete batching plant layout, show:<\/p>\n<ul>\n<li>main electrical incoming point;<\/li>\n<li>control-cable routes;<\/li>\n<li>water storage and piping;<\/li>\n<li>air compressor location;<\/li>\n<li>drainage;<\/li>\n<li>network or communication connections;<\/li>\n<li>backup power where required.<\/li>\n<\/ul>\n<p>Keep utility routes away from areas likely to be excavated or repeatedly crossed by heavy vehicles unless they are appropriately protected.<\/p>\n<p>Also check how future equipment will connect. A layout that uses every cable tray and utility route at the initial installation can make later expansion difficult.<\/p>\n<h2>Use the Property Boundary to Plan Buffers, Not Just Fit Equipment<\/h2>\n<p>A plant can fit physically inside the boundary and still have poor relationships with neighboring areas.<\/p>\n<p>Concrete batching plant layout should consider nearby offices, public roads, residences, drainage channels and other sensitive land uses.<\/p>\n<p>Where space allows, use setbacks and buffers to separate dusty, noisy or high-traffic zones from sensitive boundaries.<\/p>\n<p>Exact setback requirements depend on local regulation and permit conditions, so they should be confirmed for the actual site rather than copied from another project.<\/p>\n<p>The layout should leave enough room for environmental controls and safe access around the perimeter.<\/p>\n<h2>Plan Future Expansion Before the Initial Plant Fills the Site<\/h2>\n<p>A concrete producer may later add another cement silo, aggregate bin, packaging system, recycled-water unit or secondary loading point.<\/p>\n<p>If future expansion is likely, reserve a realistic zone on the initial concrete batching plant layout.<\/p>\n<p>Consider:<\/p>\n<ul>\n<li>future silo foundations;<\/li>\n<li>extra aggregate storage;<\/li>\n<li>extended conveyor routes;<\/li>\n<li>additional electrical load;<\/li>\n<li>new truck lanes;<\/li>\n<li>extra maintenance access;<\/li>\n<li>control-system I\/O capacity.<\/li>\n<\/ul>\n<p>Do not label a narrow strip of unused land \u201cfuture expansion\u201d unless the equipment and traffic can actually reach it.<\/p>\n<h2>Use a Zone-by-Zone Layout Review Before Final Approval<\/h2>\n<figure class=\"wp-block-image aligncenter size-full\" style=\"text-align:center;margin:28px auto;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/mixingplantpro.com\/wp-content\/uploads\/2026\/08\/Side-mounted-belt-concrete-mixing-plant04.jpg\" alt=\"Seitlich angebrachte Pulversilos neben einer geschlossenen Betonmischanlage\" width=\"800\" height=\"600\" style=\"display:block;margin-left:auto;margin-right:auto;max-width:100%;height:auto;\" \/><\/figure>\n<p>Before approving the concrete batching plant layout, walk through the site on paper as if the plant were already operating.<\/p>\n<p>Ask:<\/p>\n<table>\n<thead>\n<tr>\n<th>Zone<\/th>\n<th>Review question<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Aggregate receiving<\/td>\n<td>Can delivery trucks unload without blocking production traffic?<\/td>\n<\/tr>\n<tr>\n<td>Loader route<\/td>\n<td>Can the loader move between stockpiles and bins without crossing truck queues repeatedly?<\/td>\n<\/tr>\n<tr>\n<td>Cement delivery<\/td>\n<td>Can tankers fill silos without blocking mixer trucks?<\/td>\n<\/tr>\n<tr>\n<td>Truck dispatch<\/td>\n<td>Can trucks queue, load and exit in sequence?<\/td>\n<\/tr>\n<tr>\n<td>Maintenance<\/td>\n<td>Can major components be accessed and removed?<\/td>\n<\/tr>\n<tr>\n<td>Environmental control<\/td>\n<td>Are dust and water sources located where they can be managed?<\/td>\n<\/tr>\n<tr>\n<td>Expansion<\/td>\n<td>Can future equipment be added without redesigning the whole yard?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>This zone-by-zone review turns the concrete batching plant layout into an operating plan rather than a drawing of equipment footprints.<\/p>\n<h2>What Should Buyers Send for a Layout Review?<\/h2>\n<p>A useful concrete batching plant layout review requires real site information.<\/p>\n<p>Bereitstellen:<\/p>\n<ul>\n<li>property dimensions;<\/li>\n<li>survey or topographic information where available;<\/li>\n<li>site entrances and public-road connection;<\/li>\n<li>existing buildings and utilities;<\/li>\n<li>aggregate delivery method;<\/li>\n<li>cement tanker access;<\/li>\n<li>expected mixer-truck type and quantity;<\/li>\n<li>peak concrete production schedule;<\/li>\n<li>environmental or local setback requirements;<\/li>\n<li>Zuk\u00fcnftige Ausbaupl\u00e4ne.<\/li>\n<\/ul>\n<p>Unser <a href=\"https:\/\/mixingplantpro.com\/de\/anpassung\/\">Kundengebundener Anlagenkonfigurationsservice<\/a> can use these inputs to compare equipment arrangements around the actual site.<\/p>\n<p>Send your site drawing and production requirements through our <a href=\"https:\/\/mixingplantpro.com\/de\/kontaktieren-sie-uns\/\">Kontaktseite<\/a> for a project-specific layout review.<\/p>\n<h2>Schlussfolgerung<\/h2>\n<p>Concrete batching plant layout should be planned around functional zones, not only equipment dimensions. Aggregate receiving, loader routes, cement deliveries, truck dispatch, maintenance, dust control and process water all compete for space on the same site.<\/p>\n<p>The strongest layout minimizes unnecessary traffic crossings, keeps material flow direct, gives operators useful visibility and reserves enough space for maintenance and future expansion.<\/p>\n<p>When these zones are planned before equipment positions are fixed, the batching plant becomes easier to operate, service and expand over its working life.<\/p>\n<h2>FAQ<\/h2>\n<h3>What are the main zones in a concrete batching plant layout?<\/h3>\n<p>Main zones normally include aggregate receiving and storage, aggregate transfer, cement silos, batching and mixing, truck loading, washout, maintenance, utilities, control room and future expansion areas.<\/p>\n<h3>Why should loader routes be separated from mixer trucks?<\/h3>\n<p>Repeated route crossings can create congestion and slow both aggregate feeding and truck dispatch. A concrete batching plant layout should reduce unnecessary interaction between these high-frequency vehicle movements.<\/p>\n<h3>Which is better for layout: overhead or side-mounted silos?<\/h3>\n<p>Neither is universally better. Overhead silos concentrate storage vertically, while side-mounted silos use more horizontal space but can simplify certain maintenance and delivery arrangements. The correct choice depends on the site.<\/p>\n<h3>How much truck queue space does a batching plant need?<\/h3>\n<p>The required space depends on peak dispatch demand, truck size, loading cycle and site access. Use the expected maximum queue during the busiest production window rather than an average daily number.<\/p>\n<h3>What information is needed to design a concrete batching plant layout?<\/h3>\n<p>Provide property dimensions, access roads, existing structures, aggregate and cement delivery methods, mixer-truck requirements, utilities, environmental constraints and future expansion plans.<\/p>","protected":false},"excerpt":{"rendered":"<p>Concrete batching plant layout has a direct effect on production rhythm, material handling, truck movement, maintenance access and environmental control. A plant can have suitable mixer capacity and reliable weighing equipment yet still perform poorly if aggregate loaders cross truck queues, cement tankers block dispatch lanes, or maintenance areas are squeezed between operating equipment. For [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":408,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_title":"Concrete Batching Plant Layout: Zones to Plan First","rank_math_description":"Plan concrete batching plant layout around aggregates, truck flow, silos, maintenance and expansion. Send your site drawing for a layout review.","rank_math_canonical_url":"","rank_math_focus_keyword":"concrete batching plant layout"},"categories":[1],"tags":[167,166,164,169,165,168],"class_list":["post-1177","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-aggregate-storage","tag-batching-plant-site-planning","tag-concrete-batching-plant-layout","tag-concrete-plant-configuration","tag-concrete-plant-design","tag-truck-flow"],"_links":{"self":[{"href":"https:\/\/mixingplantpro.com\/de\/wp-json\/wp\/v2\/posts\/1177","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mixingplantpro.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mixingplantpro.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mixingplantpro.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mixingplantpro.com\/de\/wp-json\/wp\/v2\/comments?post=1177"}],"version-history":[{"count":1,"href":"https:\/\/mixingplantpro.com\/de\/wp-json\/wp\/v2\/posts\/1177\/revisions"}],"predecessor-version":[{"id":1178,"href":"https:\/\/mixingplantpro.com\/de\/wp-json\/wp\/v2\/posts\/1177\/revisions\/1178"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mixingplantpro.com\/de\/wp-json\/wp\/v2\/media\/408"}],"wp:attachment":[{"href":"https:\/\/mixingplantpro.com\/de\/wp-json\/wp\/v2\/media?parent=1177"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mixingplantpro.com\/de\/wp-json\/wp\/v2\/categories?post=1177"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mixingplantpro.com\/de\/wp-json\/wp\/v2\/tags?post=1177"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}