{"id":1304,"date":"2026-11-03T08:00:00","date_gmt":"2026-11-03T08:00:00","guid":{"rendered":"https:\/\/mixingplantpro.com\/?p=1304"},"modified":"2026-11-03T08:00:00","modified_gmt":"2026-11-03T08:00:00","slug":"dry-vs-wet-sand-production-routes","status":"publish","type":"post","link":"https:\/\/mixingplantpro.com\/fr\/dry-vs-wet-sand-production-routes\/","title":{"rendered":"Dry vs Wet Sand Production: Compare the Complete Material and Water Routes"},"content":{"rendered":"<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h2>Table des mati\u00e8res<\/h2><nav><ul><li class=\"\"><a href=\"#set-the-feed-basis-for-dry-vs-wet-sand-production\">Set the feed basis for dry vs wet sand production<\/a><\/li><li class=\"\"><a href=\"#define-the-finished-product-at-the-customer-boundary\">Define the finished product at the customer boundary<\/a><\/li><li class=\"\"><a href=\"#draw-every-material-destination\">Draw every material destination<\/a><\/li><li class=\"\"><a href=\"#map-the-water-related-interfaces-explicitly\">Map the water-related interfaces explicitly<\/a><\/li><li class=\"\"><a href=\"#review-downstream-storage-and-use\">Review downstream storage and use<\/a><\/li><li class=\"\"><a href=\"#compare-scope-on-a-common-basis\">Compare scope on a common basis<\/a><\/li><li class=\"\"><a href=\"#design-a-trial-that-tests-the-decision\">Design a trial that tests the decision<\/a><\/li><li class=\"\"><a href=\"#request-a-coordinated-sand-production-proposal\">Request a coordinated sand-production proposal<\/a><\/li><li class=\"\"><a href=\"#frequently-asked-questions\">Questions fr\u00e9quemment pos\u00e9es<\/a><\/li><\/ul><\/nav><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Dry vs wet sand production is a project comparison involving the feed, product requirements and all material routes around the main equipment. A dry arrangement and a wet arrangement may separate or handle material differently, but their names alone do not establish which will meet a particular customer&#x27;s needs. Buyers need a common feed basis, a defined finished-product specification and evidence from relevant trials.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Begin by identifying the decision that must be made. Is the project choosing a new line, adapting an existing arrangement or addressing a particular product-quality issue? Keep that question visible throughout the comparison. Otherwise, the discussion can drift into generic advantages that do not resolve the site&#x27;s actual constraint.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"set-the-feed-basis-for-dry-vs-wet-sand-production\">Set the feed basis for dry vs wet sand production<\/h2>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/mixingplantpro.com\/wp-content\/uploads\/2026\/08\/Manufactured-Sand-Production-Line01.jpg\" alt=\"Structure de production de sable fabriqu\u00e9e avec bacs sur\u00e9lev\u00e9s et plates-formes en acier\" class=\"wp-image-429\" srcset=\"https:\/\/mixingplantpro.com\/wp-content\/uploads\/2026\/08\/Manufactured-Sand-Production-Line01.jpg 800w, https:\/\/mixingplantpro.com\/wp-content\/uploads\/2026\/08\/Manufactured-Sand-Production-Line01-300x225.jpg 300w, https:\/\/mixingplantpro.com\/wp-content\/uploads\/2026\/08\/Manufactured-Sand-Production-Line01-768x576.jpg 768w, https:\/\/mixingplantpro.com\/wp-content\/uploads\/2026\/08\/Manufactured-Sand-Production-Line01-600x450.jpg 600w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Record the source material, expected size distribution and relevant moisture conditions using an agreed sampling plan. Include meaningful variation rather than selecting only a convenient sample from a dry operating period. The equipment supplier needs to know the range it is being asked to assess and the evidence supporting that range.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dry vs wet sand production should be compared against the same representative feed. If one trial uses a different rock source or a differently prepared sample, explain the difference and its effect on the interpretation. Do not attribute every observed product change to the process route when the incoming material also changed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Separate measured characteristics from assumptions awaiting investigation. A tender description such as clean hard rock is less useful than identifiable samples, test results and a stated source history. Ask the relevant specialists which further properties they need before making a performance commitment.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"define-the-finished-product-at-the-customer-boundary\">Define the finished product at the customer boundary<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">List the intended products and their acceptance basis. Include grading and any other requirements established for the actual application. Distinguish the processing plant&#x27;s output from material accepted by the downstream customer or production process. A line can produce a saleable fraction only if that fraction meets the agreed requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Use a recognized applicable test method for the grading comparison. The <a href=\"https:\/\/store.astm.org\/astm-tpt-165.html\" target=\"_blank\" rel=\"noopener\">ASTM C136 course overview<\/a> concerns sieve analysis of fine and coarse aggregates. Select the actual sampling and testing requirements with the quality team; the overview does not establish the project&#x27;s product limits.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In a dry vs wet sand production review, report the complete product results rather than a single favorable index. Keep sample identity, processing conditions and test dates connected. The buyer should be able to trace the proposed product evidence back to the trial feed and equipment arrangement.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"draw-every-material-destination\">Draw every material destination<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Show finished fractions, returning material and separated fines on the proposed process diagrams. Identify where each stream is collected, stored and transferred. A stream that is absent from the sales product list still needs a defined destination and handling responsibility within the project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask the supplier to provide a material balance with its assumptions. Compare incoming material, accepted products, internal return and other outputs on consistent units and boundaries. An apparent high product yield is difficult to interpret if one proposal includes moisture or retained fines differently from the other.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dry vs wet sand production comparisons should state which streams have a confirmed market or downstream use and which remain unresolved. Do not assume that every separated fraction can be sold at the main product&#x27;s price. Keep commercial assumptions separate from demonstrated physical outputs.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"map-the-water-related-interfaces-explicitly\">Map the water-related interfaces explicitly<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For any proposed arrangement using water, identify the supply, process circulation, recovery and other relevant interfaces for specialist review. Ask for a project-specific water balance and the basis of its assumptions. A generic description such as closed circulation does not explain the initial supply, losses, operating variation or all maintenance conditions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Identify the equipment and responsibility for the separated material associated with the water route. Storage, handling and destination need coordination with the site&#x27;s actual plan. Requirements for discharge or other regulated activities should be confirmed by the responsible local specialists; a process brochure is not a permitting decision.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For a dry arrangement, ask which site services and material-condition constraints remain relevant. The word dry should not be treated as evidence that moisture variation is irrelevant or that all environmental interfaces disappear. Compare the complete proposed scope rather than allowing either process label to replace the design review.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"review-downstream-storage-and-use\">Review downstream storage and use<\/h2>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"800\" height=\"535\" src=\"https:\/\/mixingplantpro.com\/wp-content\/uploads\/2026\/07\/news05.jpg\" alt=\"Sand processing equipment beside outdoor aggregate stockpiles\" class=\"wp-image-231\" srcset=\"https:\/\/mixingplantpro.com\/wp-content\/uploads\/2026\/07\/news05.jpg 800w, https:\/\/mixingplantpro.com\/wp-content\/uploads\/2026\/07\/news05-300x201.jpg 300w, https:\/\/mixingplantpro.com\/wp-content\/uploads\/2026\/07\/news05-768x514.jpg 768w, https:\/\/mixingplantpro.com\/wp-content\/uploads\/2026\/07\/news05-600x401.jpg 600w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Establish the required condition of the product at dispatch or at the next manufacturing stage. Storage time, handling arrangement and moisture information may influence how the product is used. Ask the downstream team to review the proposed handover so that an acceptable grading result is not mistaken for a complete production-use decision.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where sand feeds a mortar operation, include that operation&#x27;s actual material requirements in the comparison. A product suitable for one customer does not automatically satisfy another process. The supplier should explain any further conditioning, storage or transfer equipment included in its proposal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The dry vs wet sand production assessment should therefore follow the product beyond the main separator. Review stockpile or bin identity, sampling points and material-release records. A useful plant proposal connects the selected processing route to the condition and quantity required at the buyer&#x27;s final boundary.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"compare-scope-on-a-common-basis\">Compare scope on a common basis<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The following table turns broad process descriptions into procurement questions. It does not claim that either route always has lower cost or better performance; those outcomes require evidence for the actual material and installation.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Comparison item<\/th><th>Information needed for both routes<\/th><th>Common gap to resolve<\/th><\/tr><\/thead><tbody><tr><td>Feed basis<\/td><td>Identified source, grading and moisture range<\/td><td>Different trial samples presented as equivalent<\/td><\/tr><tr><td>Accepted products<\/td><td>Defined fractions and application requirements<\/td><td>Headline output without acceptance results<\/td><\/tr><tr><td>Other material<\/td><td>Quantities, destinations and handling scope<\/td><td>Separated fines missing from the proposal<\/td><\/tr><tr><td>Site services<\/td><td>Project-specific demand and connection boundaries<\/td><td>Generic utility claims without conditions<\/td><\/tr><tr><td>Downstream interface<\/td><td>Required product condition and storage route<\/td><td>Processing output treated as dispatch-ready<\/td><\/tr><tr><td>Trial evidence<\/td><td>Comparable measurements and operating context<\/td><td>A short demonstration used as a full-duty guarantee<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Compare capital and operating assumptions only after these boundaries agree. Identify equipment supplied by others and any unresolved destination or site service. Otherwise, a lower equipment price may simply describe a narrower project scope.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"design-a-trial-that-tests-the-decision\">Design a trial that tests the decision<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Agree representative feed samples, product targets and measurement boundaries before the trial. Keep the operating configuration and observations with the results. Where practical and relevant, include more than one feed condition so that the proposed selection is not based solely on a favorable isolated run.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Record accepted product quantities and other outputs over the same interval. State whether the trial establishes a particular measured result or supports a broader supplier proposal. Do not extrapolate an observed short-term result into a guaranteed annual output without the supplier&#x27;s explicit performance basis.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Review the remaining uncertainty with the supplier and downstream quality team. The decision may require another sample, a revised process arrangement or a clearer acceptance criterion. Dry vs wet sand production is best resolved by a documented evidence gap and follow-up plan rather than a general preference for one process name.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"request-a-coordinated-sand-production-proposal\">Request a coordinated sand-production proposal<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Use the <a href=\"https:\/\/mixingplantpro.com\/fr\/produit\/ligne-de-production-de-sable-manufacture\/\">ligne de production de sable manufactur\u00e9<\/a> as the product starting point. If sand will serve an on-site mortar operation, review the <a href=\"https:\/\/mixingplantpro.com\/fr\/produit\/usine-de-sable-manufacture-et-de-mortier-special\/\">usine int\u00e9gr\u00e9e de sable manufactur\u00e9 et de mortier sp\u00e9cial<\/a> with the complete downstream material requirements included.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Send the source-material information, identified samples, intended product specifications, site-service constraints and proposed material destinations. Ask the supplier to explain the assumptions in its material and water balances and the evidence supporting the selected configuration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A useful quotation connects feed variation, accepted products, other streams and downstream use. That connection makes the dry vs wet sand production choice reviewable by procurement, operations and quality together. Request a comparison based on your actual feed and customer boundary rather than relying on generic process advantages.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"frequently-asked-questions\">Questions fr\u00e9quemment pos\u00e9es<\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-question-yg-0026-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Is there a universal winner in dry vs wet sand production?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No universal conclusion follows from the route name. Compare the actual feed, required products, site interfaces and representative trial evidence for the proposed configurations.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-yg-0026-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Should both proposals use the same trial feed?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Use a common representative basis wherever possible. Identify differences explicitly so that a feed change is not mistaken for a process advantage.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-yg-0026-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What belongs in the material balance?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Show incoming material, accepted products, internal return and other separated outputs using consistent boundaries. State assumptions and identify every destination and handling responsibility.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-yg-0026-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Does closed water circulation remove all water questions?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. Ask for the actual supply, circulation, recovery and other relevant interfaces and operating assumptions. Local specialists must assess any applicable site requirements.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-yg-0026-5\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What makes a quotation comparison useful?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Align the feed, acceptance criteria, material destinations, services and downstream handover first. Then compare price and performance on that common project scope.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<div class='fluentform ff-default fluentform_wrapper_3 ffs_default_wrap'><form data-form_id=\"3\" id=\"fluentform_3\" class=\"frm-fluent-form fluent_form_3 ff-el-form-top ff_form_instance_3_1 ff-form-loading ffs_default\" data-form_instance=\"ff_form_instance_3_1\" method=\"POST\" action=\"\" ><fieldset  style=\"border: none!important;margin: 0!important;padding: 0!important;background-color: transparent!important;box-shadow: none!important;outline: none!important; min-inline-size: 100%;\">\n                    <legend class=\"ff_screen_reader_title\" style=\"display: block; margin: 0!important;padding: 0!important;height: 0!important;text-indent: -999999px;width: 0!important;overflow:hidden;\">\u5b98\u7f51\u8be2\u76d8<\/legend>        <div\n                style=\"display: none!important; position: absolute!important; transform: translateX(1000%)!important;\"\n                class=\"ff-el-group ff-hpsf-container\"\n        >\n            <div class=\"ff-el-input--label asterisk-right\">\n                <label for=\"ff_3_item_sf\" aria-label=\"Mises \u00e0 jour\">\n                    Mises \u00e0 jour                <\/label>\n            <\/div>\n            <div class=\"ff-el-input--content\">\n                <input type=\"text\"\n                       name=\"item_3__fluent_sf\"\n                       class=\"ff-el-form-control\"\n                       id=\"ff_3_item_sf\"\n                \/>\n            <\/div>\n        <\/div>\n        <input type='hidden' name='__fluent_form_embded_post_id' value='1304' \/><input type=\"hidden\" id=\"_fluentform_3_fluentformnonce\" name=\"_fluentform_3_fluentformnonce\" value=\"76a022f0bd\" \/><input type=\"hidden\" name=\"_wp_http_referer\" value=\"\/fr\/wp-json\/wp\/v2\/posts\/1304\" \/><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_input_text' id='label_ff_3_input_text' aria-label=\"Nom\">Nom<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"input_text\" class=\"ff-el-form-control\" placeholder=\"Nom\" data-name=\"input_text\" id=\"ff_3_input_text\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_email' id='label_ff_3_email' aria-label=\"Courriel\">Courriel<\/label><\/div><div class='ff-el-input--content'><input type=\"email\" name=\"email\" id=\"ff_3_email\" class=\"ff-el-form-control\" placeholder=\"Adresse e-mail\" data-name=\"email\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_subject' id='label_ff_3_subject' aria-label=\"T\u00e9l\u00e9phone\">T\u00e9l\u00e9phone<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"subject\" class=\"ff-el-form-control\" placeholder=\"T\u00e9l\u00e9phone\" data-name=\"subject\" id=\"ff_3_subject\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label asterisk-right\"><label for='ff_3_message' id='label_ff_3_message' aria-label=\"Votre Message\">Votre Message<\/label><\/div><div class='ff-el-input--content'><textarea aria-required=\"false\" aria-labelledby=\"label_ff_3_message\" name=\"message\" id=\"ff_3_message\" class=\"ff-el-form-control\" placeholder=\"Votre Message\" rows=\"5\" cols=\"2\" data-name=\"message\" ><\/textarea><\/div><\/div><div class='ff-el-group ff-text-left ff_submit_btn_wrapper'><button type=\"submit\" class=\"ff-btn ff-btn-submit ff-btn-md ff_btn_style\"  aria-label=\"Soumettre Formulaire\">Soumettre Formulaire<\/button><\/div><\/fieldset><input type=\"hidden\" name=\"trp-form-language\" value=\"fr\"\/><\/form><div id='fluentform_3_errors' class='ff-errors-in-stack ff_form_instance_3_1 ff-form-loading_errors ff_form_instance_3_1_errors'><\/div><\/div>            <script type=\"text\/javascript\">\n                window.fluent_form_ff_form_instance_3_1 = {\"id\":\"3\",\"ajaxUrl\":\"https:\\\/\\\/mixingplantpro.com\\\/wp-admin\\\/admin-ajax.php\",\"settings\":{\"layout\":{\"labelPlacement\":\"top\",\"helpMessagePlacement\":\"with_label\",\"errorMessagePlacement\":\"inline\",\"cssClassName\":\"\",\"asteriskPlacement\":\"asterisk-right\"},\"restrictions\":{\"denyEmptySubmission\":{\"enabled\":false}}},\"form_instance\":\"ff_form_instance_3_1\",\"form_id_selector\":\"fluentform_3\",\"rules\":{\"input_text\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"email\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"},\"email\":{\"value\":true,\"message\":\"This field must contain a valid email\",\"global\":false,\"global_message\":\"This field must contain a valid email\"}},\"subject\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}},\"message\":{\"required\":{\"value\":false,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}}},\"debounce_time\":300,\"file_upload_settings\":[]};\n                            <\/script>","protected":false},"excerpt":{"rendered":"<p>Dry vs wet sand production is a project comparison involving the feed, product requirements and all material routes around the main equipment. A dry arrangement and a wet arrangement may separate or handle material differently, but their names alone do not establish which will meet a particular customer&#x27;s needs. Buyers need a common feed basis, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":429,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_title":"Dry vs Wet Sand Production: Material and Water Routes","rank_math_description":"Compare dry vs wet sand production using feed evidence, product grading, water routes, separated fines and the actual downstream delivery requirements.","rank_math_canonical_url":"","rank_math_focus_keyword":"dry vs wet sand production"},"categories":[1],"tags":[],"class_list":["post-1304","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/mixingplantpro.com\/fr\/wp-json\/wp\/v2\/posts\/1304","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mixingplantpro.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mixingplantpro.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mixingplantpro.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mixingplantpro.com\/fr\/wp-json\/wp\/v2\/comments?post=1304"}],"version-history":[{"count":1,"href":"https:\/\/mixingplantpro.com\/fr\/wp-json\/wp\/v2\/posts\/1304\/revisions"}],"predecessor-version":[{"id":2284,"href":"https:\/\/mixingplantpro.com\/fr\/wp-json\/wp\/v2\/posts\/1304\/revisions\/2284"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mixingplantpro.com\/fr\/wp-json\/wp\/v2\/media\/429"}],"wp:attachment":[{"href":"https:\/\/mixingplantpro.com\/fr\/wp-json\/wp\/v2\/media?parent=1304"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mixingplantpro.com\/fr\/wp-json\/wp\/v2\/categories?post=1304"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mixingplantpro.com\/fr\/wp-json\/wp\/v2\/tags?post=1304"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}