The Concrete Mixing Tower uses modular design, fast installation, rapid arc-corner discharge, high-precision metering, low-power distribution, and accurate material splitting. It serves large commercial concrete bases, major infrastructure projects, precast yards, and fixed production sites requiring high capacity and quality.
√ Modular Design
√ Arc Angle
√ Roof Storage Warehouse
√ Arc Angle Cutting Fast
√ Low Power, Fast And Accurate Material Separation
√ Focus On Non-Stick Shafts
√ Large Reserve Hopper
√ High Efficiency, High Performance, Low Maintenance Cost
√ Low Noise, Full Recovery, Zero Pollution
√ One-Click Operation, Fault Diagnosis, Simulation And Simulation
Product Overview
The Concrete Mixing Tower adopts a modular design with fast installation. It provides rapid arc-corner discharge, high coarse and fine metering accuracy, low-power operation, and fast, accurate material distribution.
It mainly serves large commercial concrete core production bases and dedicated high-performance concrete stations. It is widely used in super-large infrastructure projects and is also core supporting mixing equipment for prefabricated building industrial parks and large precast component factories.
The tower is suitable for long-term fixed production scenarios with high standards for concrete capacity, quality, and environmental performance.
Application Fields
It is mainly used in large commercial concrete supply bases and centralized commercial concrete stations in urban core areas. It also supports major infrastructure projects such as large water conservancy hubs, high-speed rail hubs, and super high-rise clusters, as well as large precast beam yards and prefabricated PC component factories with high capacity and concrete quality requirements.
Core Advantages
The roof storage bin uses a modular design and is convenient to install.
The high-precision metering system uses arc-corner discharge for fast feeding and high coarse and fine metering accuracy.
The rotary distribution system provides low-power operation and fast, accurate material distribution.
The transition storage hopper uses multiple arch-breaking solutions for more stable operation.
The eccentric heavy-hammer discharge door opens and closes flexibly, quickly, and steadily.
The centralized feeding device feeds centrally without shaft adhesion and provides a premixing function for easier mixing.
The pre-storage device uses a large-capacity hopper to improve production efficiency.
The high-performance mixer provides high efficiency, high performance, and low maintenance cost.
The high-environmental sand and gravel separation system provides low noise, full recovery, and zero pollution.
The highly intelligent control system supports one-button operation, fault diagnosis, and simulation.
Technical Specifications
| Concrete Mixing Tower | ||||||
| Model | HLS120 | HLS180 | HLS210 | HLS240 | HLS270 | HLS300 |
| Theoretical Production Rate | 120 | 180 | 210 | 240 | 270 | 300 |
| Mixer | CHS2000 | CHS3000 | CHS3500 | CHS4000 | CHS4500 | CHS5000 |
| Dosing System | PLD3200 | PLD4800 | PLD5000 | PLD6400 | PLD7200 | PLD8000 |
| Discharge Height | 4200 | 4200 | 4200 | 4200 | 4200 | 4200 |
| Maximum Aggregate Size | 60(80) | 60(80) | 60(80) | 60(80) | 60(80) | 60(80) |
| Mixing Cycle Time | 60 | 60 | 60 | 60 | 60 | 60 |
| Aggregate Metering Accuracy | 0.02 | 0.02 | 0.02 | 0.02 | 0.02 | 0.02 |
| Cement Metering Accuracy | 0.01 | 0.01 | 0.01 | 0.01 | 0.01 | 0.01 |
| Water Metering Accuracy | 0.01 | 0.01 | 0.01 | 0.01 | 0.01 | 0.01 |
| Admixture Metering Accuracy | 0.01 | 0.01 | 0.01 | 0.01 | 0.01 | 0.01 |
| Total Installed Power | 210 | 230 | 230 | 310 | 310 | 340 |
Reliable structural design and proven technology ensure stable operation under continuous production conditions.
Advanced batching and control systems improve material proportioning accuracy and production consistency.
Multiple models and configurations are available to meet different capacities, processes and site requirements.
Strict production management and multi-stage factory testing help ensure consistent equipment quality before delivery.
Optimized system design and automated control simplify daily operation and improve overall production efficiency.
Equipment configuration and plant layout can be customized according to specific project and production requirements.